CAD MASTERS uses the latest technology to connect a proposed schedule to the 3D BIM model. All major inconsistencies and problems in a proposed schedule cannot be easily spotted without a 4D simulation, and using our advanced BIM Construction Scheduling techniques, methodology analysis and different visualizations, they can be detected and resolved in a timely manner. Construction time as well as the number of discontinuities in work flow can be significantly reduced.
- 4D visualization of the proposed construction schedule
- Detailed comments regarding quality of schedule
- Detection of potential problems, suggestion of possible improvements
- Propose measures to mitigate and/or compensate for delays and bring the construction back on track
- Assistance to the Client on developing a detailed, integrated, master schedule
- Line of Balance Reports
- Update and revised as necessary the construction schedule