BIM Construction Technical Office Archi.

BIM Construction Technical Office Archi.

Start Date
End Date
Lectures /Hours Schedule /
Time
Branch Price /
Offer
Register NOW
28-02-2025
24-07-2025
36 / 144 Saturday - Thursday /
6:30 - 10:30 P.M
Nasr City 26500-- Contact us for current discount Register
24-12-2024
27-04-2024
36 / 144 Sunday - Thursday /
7:00 - 11:30 P.M
Live streaming (Online ) 26500-- Contact us for current discount Register

 

Track Description

The Construction phase is the stage during which the contractor (or principal contractor where more than one contractor on site at any one time) takes control of the construction site to carry out the path works, and when the works are complete, the contractor hands the site back to client. The contractor shall prepare the construction phase plan to make sure that welfare facilities are in place before any work begins, prepare shop drawings that can be termed to be the bridge between building design and physical buildings. Contractor shall also insure that the project is coordinated, and resolve any outstanding conflicts.
BIM technology supports Architects throughout the construction and shop drawing process to manage the construction phase using the latest technological tools and techniques that helps in delivering projects with improved quality and efficiency.
The BIM Construction Technical Office track for architects is developed to serve them to provide clients with methods of preparation for drawings that streamline the detailed requirement for the construction of a building by preparing LOD 400 BIM Model which includes minutest details pertaining to the size, location, shape, assembly and several other vital details.